Monday, August 13, 2012

Just a reminder, curb preparation and installation work on the south side of Bel-Air commenced on Monday morning, August 13th and weather permitting will be completed by Saturday, August 18th.   Driveway access to these homes will be restored beginning Monday morning, August 20th. 
Access from residences to the street will be provided at 2415, 2501 and 2541 Bel Air.  At these locations the orange stringline will be lowered to the ground and pathway will be provided.  When concrete curb is poured there will be a gap left in the curb at these locations for access until the concrete is acceptable to drive on.  These gaps in the curb will be poured during construction of the north side curb.